5S method
Introducing the 5S method: guide, examples and checklist
Guides
Introducing the 5S method: guide, examples and checklist
With the 5S method you create fixed places, clear standards and short routines for production, warehouse, workshop and office. This guide takes you from choosing a pilot area through the five steps to the audit – with templates to adopt.
Request equipment for your 5S project
What does 5S mean?
5S describes five workplace organisation practices from Lean management: Sort, Set in order, Shine, Standardise and Sustain.
| Step | Guiding question | Visible result |
|---|---|---|
| 1. Sort (Seiri) | What is really needed here? | Needed tools, resolved removals |
| 2. Set in order (Seiton) | Where is the best place? | Clear, logically arranged locations |
| 3. Shine (Seiso) | What stands out during cleaning? | Clean area, documented defects |
| 4. Standardise (Seiketsu) | What should the condition look like? | Target photos, responsibilities, short routines |
| 5. Sustain (Shitsuke) | How do we maintain and improve the standard? | Regular audits, implemented improvements |
Set goals and choose a pilot area
Start with a concrete problem: tools are searched for, material is in the wrong place or information is missing at shift handover. Choose two or three observable goals, such as shorter search paths or clear material assignment.
A clearly defined area with recurring tasks makes a good pilot – an assembly station, a packing station or a tool trolley. Photograph the initial situation and ask staff where they search, wait or walk unnecessarily.
| Role | Task in the pilot |
|---|---|
| Area manager | Clarify goal, working time and budget; remove obstacles |
| Employees of all shifts | Develop the layout, test it, report improvements |
| 5S coordinator | Prepare workshop, track decisions and actions |
| Maintenance, safety | Assess technology, cleaning, ergonomics and approvals |
Implementing the five steps
- Sort: record tools, materials and documents. Unclear items get a red tag with owner and decision date.
- Set in order: place frequently needed items within easy reach, name locations, set minimum and maximum quantities. Shadow boards and labels make missing items visible.
- Shine: combine cleaning with visual inspection; report damage, leaks and loose parts.
- Standardise: document the target state with a photo and a few rules: who does what, when and with what?
- Sustain: short regular rounds, discuss deviations objectively and fix causes.
Red tag card: keep, move or remove
The red tag marks an open review – it is not an automatic disposal release. A rarely needed spare part may be essential for operations.
| Field | Example |
|---|---|
| Number / date | RT-014 / [date] |
| Item / location | Clamping fixture / assembly station M-02 |
| Reason | Use and owner unclear |
| Owner / deadline | [name] / [date] |
| Decision | Keep in place, store centrally, return or dispose properly |
| Completion | New location or completed action with date |
Designing fixed places and visual standards
- Name locations clearly: same name on container, shelf and material list.
- Make missing items visible: shadow boards, outlines, labelled compartments or target photo.
- Limit quantities: set minimum and maximum stock and a replenishment rule.
- Separate status: released material, returns and unclear parts.
- Order floor markings and labels only once the layout has been tested in daily work.
Colours supplement text and symbols. Operational colours must not cover or be confused with safety markings.
Template: 5S workplace standard
| Element | Example packing station P-02 |
|---|---|
| Scope | Packing station P-02, early and late shift |
| Target state | Photo with labelled locations; packing surface clear |
| Material supply | Boxes and tape on marked places; refill at minimum quantity |
| Routine | Shift start: check completeness; shift end: put back and clean |
| Deviations | Report missing parts or damage and enter in the action list |
| Owner / version | [name], as of [date], next review [date] |
Examples for warehouse, workshop and office
| Area / situation | Possible 5S measures | How you see the effect |
|---|---|---|
| Warehouse: similar items mixed up | Standardise location codes, provide returns separately | Fewer picking errors |
| Workshop: tools missing | Fixed places on the tool trolley, rules for taking and returning | Tools can be found |
| Office: several versions of a template | Define the master source, mark released templates | Current template found without asking |
| Digital filing: unclear structure | Clear, non-overlapping folder structure and uniform file names | Files found by authorised users |
Proposal: 4-week pilot and workshop
| Period | Focus | Result |
|---|---|---|
| Week 1 | Choose area, involve team, document initial state | Defined pilot, baseline values |
| Week 2 | Sort, test locations, clean | Workable layout |
| Week 3 | Test the standard with all shifts | Photos, checklist, task allocation |
| Week 4 | Check effect and improve | KPI comparison, decision on roll-out |
A kick-off workshop of about four hours covers: discuss goal (20 min), sort with red tags (40 min), design and test locations (60 min), clean and record defects (30 min), practical test of a typical task (50 min), record target state and actions (40 min).
5S audit: checklist with 20 checkpoints
Rate each applicable point 0 = not met, 1 = partly met, 2 = met; exclude non-applicable points from the maximum score. Evaluation: points achieved ÷ maximum possible points × 100.
| Step | Checkpoints |
|---|---|
| Sort | 1. Only needed items present? 2. Handling of unclear items defined? 3. Damaged tools dealt with? 4. Open red tags with owners and deadlines? |
| Set in order | 5. Clear place for every item? 6. Labels legible and consistent? 7. Layout suits the workflow? 8. Stock limits and refill rules defined? |
| Shine | 9. Area clean as per standard? 10. Agents, responsibility and interval defined? 11. Defects detected and reported? 12. Reported defects being handled? |
| Standardise | 13. Target state visible and current? 14. Tasks and deputies defined? 15. All shifts know the standard? 16. New employees instructed? |
| Sustain | 17. Reviews take place? 18. Actions with owners and dates? 19. Effect of completed actions checked? 20. Improvements fed into the standard? |
Measuring success and sustaining 5S
- Search time: measure the same tools for comparable tasks before and after the change.
- Picking errors: relate to a reference, e.g. per 100 picks.
- Open actions: look at overdue points and recurring deviations.
- Team feedback: ask specifically about findability, reach and handovers.
Typical pitfalls are one-off clean-ups without routines, too many colours, standards without staff involvement and too large a starting area. Roll out only when the pilot works across shift changes.
Matching products
Visual Management (Lean/5S)Floor Marking SystemsWarehouse Organization & Storage SystemsWorkshop Equipment (Workbenches etc.)
Frequently asked questions
More guides
Floor markingsWarehouse labelling
Request equipment for your 5S project
Tell us the work area, existing equipment and your goal – we help you choose markings, labelling and storage systems.
This information is a general overview and does not replace applicable regulations, manufacturer instructions and your risk assessment.
Stock & Custom Solutions
Standard range from stock plus made-to-order solutions to your specifications.
Personal Expert Consultation
Direct contact with our experts – we find the technical solution for your problem.
Brand Quality
Products from renowned manufacturers – certificates and declarations of conformity per product on request.
Delivery DE & Nordics
Reliable delivery to Germany, Denmark, Norway, Sweden and Finland – Austria and Switzerland on request.